Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorWang, J.
dc.creatorYan, Z.
dc.date.accessioned2007-05-07T20:42:35Z
dc.date.available2007-05-07T20:42:35Z
dc.date.issued2006
dc.identifier.otherESL-IC-06-11-102
dc.identifier.urihttps://hdl.handle.net/1969.1/5241
dc.description.abstractThe feasibility of an all-fresh air supply in an all-air system is investigated in theory, and the problem of AHU-handling air in low efficiency in summer and winter conditions is analyzed. The air supply temperature is almost up to standards when a heat recovery unit is fixed in the air conditioning system.en
dc.format.extent131969 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu)
dc.publisherTexas A&M University (http://www.tamu.edu)
dc.subjectall-air systemen
dc.subjectall fresh air supplyen
dc.subjectheat recovery uniten
dc.titleInvestigation of Feasibility of All-Fresh Air Supply in an All-Air Systemen


This item appears in the following Collection(s)

Show simple item record