Search
Now showing items 1-10 of 17
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
The Brazos Valley Energy Conservation Coalition, Part of the Rebuild America Program in Texas: Program Update
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The Rebuild America program is network of
community-based partnerships that rebuilds
communities by promoting the efficient use of
energy. Rebuild America is coordinated at the
national level by sponsorship through the ...
Hydraulic Modeling of Large District Cooling Systems for Master Planning Purposes
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Results of CC Follow-Up in the G. Rollie White Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
An investigation into the increase of energy
consumption of G. Rollie White Coliseum was part
of the persistence project[1], which investigates the
savings in energy consumption of ten buildings that
were commissioned by ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Integrated Commissioning for a Large Medical Facility
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The energy costs of heating, ventilating and
air conditioning usually represents a large
portion of the utility bills for a medical facility.
One large, modem medical center located in the
hot and humid region of southern ...
Using Simulation Models for District Chilled Water Distribution Systems Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The capital investment for the distribution system is often the most expensive portion of a district heating
and cooling system, which usually constitutes 50 to 70% of the total cost. Because of high initial cost, it is
very ...
Correcting Thermal Distribution Problems for a Large University Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Texas A&M University main campus in
College Station consists of 114 buildings served by
two central plants. The two main campus loops are
more than 50 years old with a total piping length for
each loop in excess of 13 ...