Search
Now showing items 1-8 of 8
Reduce Building Energy Consumption by Improving the Supply Air Temperature Schedule and Recommissioning the Terminal Boxes, Submitted to the Energy Management and Operations Division at the M.D. Anderson Cancer Center
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
At the request of the Energy Management and Operations Department at M.D. Anderson Cancer Center, the Energy Systems Laboratory of Texas A&M University performed a study of optimizing the HVAC operation at its Basic Research ...
Potential Operation and Maintenance (O&M) Savings in the Basic Science Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study of the potential energy savings due to optimizing the Heating, Ventilation and Air Conditioning (HVAC) operation schedule in the Basic Science Building at University of Texas ...
Summary of UTMB O&M Project: Energy Conservation Potential in Five Buildings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report is a summary of five reports (references 1 to 5) which provided detailed
descriptions of an O&M investigation of the following five buildings on the UTMB
campus: 1) John Sealy North Building(JSN); 2) Clinical ...
Potential Operation and Maintenance (O&M) Savings in the John Sealy North Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The LoanSTAR Monitoring and Analysis Group, Energy Systems Laboratory at Texas A&M University, was requested by University of Texas Medical Branch at Galveston to investigate O&M measures in their five LoanSTAR program ...
Reducing Building Energy Costs Using Optimized Operation Strategies for Constant Volume Air Handling Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1994)
Building energy consumption can be substantially
reduced after implementing what we call Extended
O&M Measures. The Extended O&M Measures are a
scientific refinement of traditional O&M measures.
Specifically, they ...
Potential Energy Savings from Optimized Schedule and Economizer Cycles in the Moody Library at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study which was initiated in order to estimate the potential energy savings due to optimizing the HVAC operation schedule and using economizer cycles in the Moody Library Building ...
Potential Operation and Maintenance (O&M) Savings in the John Sealy South Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The LoanSTAR Monitoring and Analysis Group was requested by UTMB to investigate O&M measures in their five LoanSTAR program buildings. This report describes the suggested O&M measures in John Sealy South Building, an ...
Potential Operation and Maintenance (O&M) Savings in the Clinical Science Building at UTMB
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
This report presents the results of a study of the potential energy savings due to
optimizing the Heating, Ventilation and Air Conditioning (HVAC) operation schedule in the Clinical Science Building at University of Texas ...