Now showing items 1-4 of 4

    • Getter, L. C. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1982)
      International Business Machines Corporation's General Technology Division facility in Austin, Texas recently underwent expansion of its manufacturing facilities. Five new structures, one manufacturing and four support, ...
    • Garcia, C. A.; Kaiser, V. A. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1981)
      A new manufacturing, engineering, and laboratory facility for IBM in Tucson, Arizona utilizes a hierarchical distributed digital control system for monitoring and control of air conditioning and space heating systems plus ...
    • Jansen, P. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1984)
      In efforts to reduce operating costs, the IBM site at Kingston, New York incorporated the energy saving concept of 'free cooling' (direct cooling of chilled water with condenser water) with the expansion of the site chilled ...
    • Koch, G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1981)
      In 1979, IBM commissioned its first large scale thermal storage system with a capacity of 2.7 million gallons of chilled water and 1.2 million gallons of reclaimed, low temperature hot water. The stored cooling energy ...