Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorTurner, W. D.en_US
dc.creatorHoucek, J. K.en_US
dc.creatorLiu, M.en_US
dc.creatorClaridge, D. E.en_US
dc.date.accessioned2005-07-25T21:03:03Z
dc.date.available2005-07-25T21:03:03Z
dc.date.issued1993en_US
dc.identifier.otherTR-93-06-01en_US
dc.identifier.urihttp://hdl.handle.net/1969.1/2117
dc.description.abstractDuring the Fall of 1992 a comprehensive survey was conducted on eight buildings at the State Capitol Complex to determine potential operations and maintenance (O&M) savings opportunities. A verbal report of the findings was presented to General Services Commission and Governor's Energy Office personnel in October, 1992. In January, 1993, a formal written report titled "Potential Operation and Maintenance (O&M) Savings at the State Capitol Complex" was transmitted to the same GSC and GEO personnel.
dc.format.extent3695292 bytes
dc.format.mimetypeapplication/pdf
dc.language.isoen_USen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu), Texas A&M Universityen_US
dc.publisherDepartment of Mechanical Engineering, Texas A&M Universityen_US
dc.rightsAll rights reserved by the Energy Systems Laboratory of Texas A&M and the authors.en_US
dc.subjectoperations and maintenance (O&M) savings opportunities
dc.titleLoanSTAR Monitoring and Analysis Program: Presentation Summary of the State Capitol Complex Building Operation and Maintenance Field Testen_US
dc.typeTexten_US


This item appears in the following Collection(s)

Show simple item record