Now showing items 1-2 of 2

    • Liu, M.; Houcek, J. K.; Claridge, D. E.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University, 1993)
      This report presents the results of a study of the potential cost savings which may be achieved by improving operational and maintenance (O&M) practices at Dunbar Middle School and Sims Elementary School in the Fort Worth ...
    • Liu, M.; Athar, A.; Reddy, T. A.; Claridge, D. E.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University, 1993)
      This report is a summary of five reports (references 1 to 5) which provided detailed descriptions of an O&M investigation of the following five buildings on the UTMB campus: 1) John Sealy North Building(JSN); 2) Clinical ...