Browsing by Subject "daytyping"
Now showing items 1-2 of 2
-
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)This is a draft of the Final Report in the ASHRAE RP-1093 project that, first summarizes the work completed during the scheduled Phase I and Phase II (presented to the PMSC in Seattle - June 1999, and Dallas February 2000), ...
-
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)This is the second report of the ASHRAE 1093-RP project that reports on the progress during the scheduled Phase II effort. In this report, we present: (1) the data sets identified and acquired required for the analysis; ...