Now showing items 1-1 of 1

    • Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003 

      Haberl, J. S.; Baltazar-Cervantes, J. C.; Liu, Z.; Claridge, D. E.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
      This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...