Now showing items 1-3 of 3

    • Improving Building Energy System Performance by Continuous Commissioning 

      Turner, W. D.; Liu, M.; Claridge, D. E.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
      The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
    • A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC 

      Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H. L.; Williams, L.; Riley, J. G. (Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
      The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
    • Texas LoanSTAR Program Savings Calculation Workbook 

      Liu, Z.; Baltazar-Cervantes, J. C.; Haberl, J. S. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
      This is the report and manual for the Texas LoanSTAR Program Savings Calculation Workbook. The purpose of this report is to document the Texas LoanSTAR Program Savings Calculation Workbook to be used by the State Energy ...