Visit the Energy Systems Laboratory Homepage.
Metering and Calibration in LoanSTAR Buildings
Abstract
End-use metering in commercial buildings often
requires installation of a large variety of transducers and data
loggers. The metering installation group in the LoanSTAR
monitoring program has the primary responsibility for the
installation and maintenance of the metering hardware. This
paper provides an overview of the responsibilities and first
year experiences of the metering installation group of the
LoanSTAR monitoring program. In addition, the calibration
laboratory is also described.
Citation
O'Neal, D. L.; Bryant, J. A.; Turner, W. D.; Glass, M. G. (1990). Metering and Calibration in LoanSTAR Buildings. Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu). Available electronically from https : / /hdl .handle .net /1969 .1 /6595.