Visit the Energy Systems Laboratory Homepage.
Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller
Citation
Chen, H.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bensouda, N. (2005). Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller. Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu). Available electronically from https : / /hdl .handle .net /1969 .1 /5103.